Not surprisingly our hopes for Christmas in the new house
came and went. But there has been progress…
Cabling complete and internal walls are up:
|
Balcony Roof Complete |
|
Looking in from front door |
|
Kitchen/Meals (How's that skylight!) |
|
Kitchen/Meals |
|
Niche for cabinetry in Formal Dining Room |
|
Formal Living (pylons will have cabinetry between them) |
|
Looking at Garage and under-stair storage from Formal Lounge |
|
Our beautiful stairs! |
|
Bulkhead in Study |
|
Upstairs TV Room |
|
Master Bedroom |
Media Room door changed to a cavity-slider to allow the raised section at the rear to be larger and so that the door doesn't take up floor space:
|
Rear of Media Room (can see cavity for sliding door on the left) |
Alfresco sliding doors rebated into slab, though they aren’t
square:
Laundry drain box in, sink purchased and waterproofing completed:
|
Laundry Sink: Belle Bowl Laundry Trough 36L. |
|
Laundry |
|
Powder Room |
Lock-up reached in the nick of time before Christmas:
|
Front door yet to be stained |
Also, we had the tiles ordered and delivered the Thursday
before Christmas (this was no mean feat and a big thank you has to go to
Fairford Tiles and Fairmont Homes who helped ensure the tiles were delivered on
time and put away inside the house quickly). This was done for the tilers who,
we were told, are working through the industry-wide shut-down. As Mick and I
both have the week after New Years off, we might pop and in and see if we can
get a glimpse of the tilers and our tiles…
A few issues still to sort through:
- - Main bathroom vanity is wall-mounted (great way
to create the illusion of space in a small room) BUT the waste is in the floor
and now looking like it can’t be moved into the wall (our pesky raked ceiling
causing us issues again). We have two options, change the vanity (have I
mentioned how much we love that vanity?) or, put up with the waste pipe coming
out from underneath the vanity into the floor. Mick did an inspection of the
vanity (well, one similar in specs) at our local Reece showroom and has
concluded that because the vanity is not too far off the floor it hopefully won’t
look too bad as long as they use a small, shiny chrome pipe for the waste
(anyone new to the blog and thinking of building, please don’t think for a
second that building is without compromise):
|
Not our actual vanity, just similar height off floor |
|
Not our actual vanity, just similar height off floor |
- -
Holes in the external wall where our Hot Water
system and pipes were removed need to be patched to stop rats setting up shop
- -
Ducting in two wardrobes were gyprocked as if
they are to be hidden inside the wardrobe behind doors though we requested they
be fully walled off. Fairmont have just gone by the usual practice, however our
wardrobes are so tiny (and ducts quite large as we have limited access to the
section downstairs where the raked ceiling is) that the ducting and gyprock
take up half the space. This creates disappointment when you then open the
wardrobe and realise that one door is pointless as it simply opens onto wall.
Might as well just wall the ducting off completely and have a single door for
the wardrobe.
|
Wardrobe Bed 3 |
|
Wardrobe Bed 2 |
- -
Pony wall, last we checked, hadn’t be removed
which I sincerely hope was corrected before tiling began as that is an
expensive re-do.
|
Pony wall on right to be removed (it was only added to allow somewhere to have a power point, but it turns out that it's against code as it's too close to bath, so we'd rather save tiling costs and open the space more). LOVE our niche above the bath. |
- -
Still waiting on a resolution for the front
windows
- -
Some windows, as mentioned before, still need to
be replaced clear for opaque and vice versa
- -
Need to order timber flooring and arrange installation,
purchase lights and order laundry cabinetry
Though I was never really convinced that we would be in by
Christmas, I did hope that we would be in in time to have our engagement party
in our new house before our close friend moves to the UK early March. This will
not happen as even if we manage to get keys in Feb (which we won’t), that is not
enough time to complete landscaping and move in (driveway is needed for
occupancy certificate). But, at least we should be in for Christmas next year…right?
Ash your home is going to be beautiful. That skylight is amazing, it's turned out really well after all. It must be such a double disappointment for you that you couldn't be in for xmas, but also for your engagement party. But in the end, I'm sure you'll have a beautiful celebration that still suits the two of you perfectly. Just not how you originally hoped it would be.
ReplyDeleteI was sooooo excited to see this pop up in my blogger feed. Thanks for the update lovely!
Thanks Lauren, you are the best :) We are pleased with how it's going but it's so draining staying on top of everything (partly our fault for going it alone for some aspects like flooring, tiling and data cabling). So sorry for the delay in posting too. Building a house, planning a wedding, issues at work and Christmas mean little spare time, not to mention the HUGE expense :(
DeleteBe glad when it's done. Hope you're right about the engagement party :)
Looking good and not long to go now. The light at the end of the tunnel is NOT an oncoming train :)
ReplyDeleteWoohoo! Thanks Kazzak :) Can't wait to be basking in the light. Haha!
DeleteThe house is looking fabulous! Love the stairs!;-)
ReplyDeleteI'd accept the disappointment about your Engagement Party venue, organise it elsewhere and take some pressure off yourselves. It's a celebration about you and your partner and the venue is unimportant although I understand the plan.
The 'not square' querie re the back doors....could the outdoor slab have a fall in it for water drainage and the doors level with inside flooring? Have your builder pop a stainless steel sleeve over the floor waste under the vanity....it's an easy fix for the plumbers error. Rush slowly and enjoy!
x KL
Thanks KL for your great tips :)
DeleteThe doors tilt, I believe, to the left but the alfresco slab drains away from the house rather than to the left. But it's really Mick who's looking after that one so I'm not 100% sure.
Thanks again for your help!
Hi Ash your house is looking fab!!! We are having some of the same issues too. Our window in meals area doesnt close well at all and same issue with our sliding door. We also had some changes to our driveway because of " code". There are also some grease stains on our tiles which i sincerely hope come out. Lots of little things that im nervous about this close to handover. Still so much to do but im sure Dan and the team will sort it all out...i hope.
ReplyDeleteSeveral of our windows don't open properly. If they're not fixed by handover, we'll be asking they be replaced. But I'm sure Fairmont are used to these issues and will sort it :)
DeleteYou prob don't have long now! You won't know yourself when you're in.
Looks very nice and big enough!
ReplyDeleteHey Ash, don't worry about not being able to have a floating vanity - I did in my last home and it annoyed me no end as all the dust bunnies congregated there - it was hard to vacuum under there especially without damaging the bottom of the vanity with the vacuum wand and getting a mop under there? Forget it! Not sure about you but I wasn't a fan of cleaning on my hands and knees!
ReplyDeleteWe now have a vanity with a tile kick board to match the floor - this gives the illusion of a floating vanity without the cleaning headache!
Great idea Nat! We're def getting one in the Powder Room and the one for the Ensuite is quite high off the ground (so hopefully cleaning won't be too hard). We'll have to see if the Main Bathroom vanity is already ordered (plus we are kinda in love with it lol).
DeleteAsh :)
It's looking fantastic! Love the kitchen skylight <3
ReplyDeleteB
Thanks B!
Delete