After my obligatory apology for being so long between posts (sorry guys!), where do I start...
The Good News
Balcony railing has been installed:
The kitchen is (mostly) in:
|
I cannot wait to see the floor complete. It will make the Kitchen sing! |
|
Photo taken through door before main painting done |
|
Photo taken through door before main painting done |
|
Photo taken through door before main painting done |
|
Photos can't do the bench top and splashback justice (Caesarstone "White Shimmer"). |
Appliances are yet to be installed and the microwave cabinet is missing. The reason the cabinet is missing is because the installer decided the Aventos lift system (click here to see it) we chose intruded too much, and instead installed a door that lifts up and rolls back into the cabinet. This is exactly the cabinet we wanted to avoid. There are already scratch marks on the cabinet from the rollers (and it will only get worse with use) and the door sticks out from the cabinet about the same length as the lift system does. So, we've told them to install the Aventos system. We'll see how we go!
The front door and stair rails are stained:
The wardrobe walls have been corrected:
|
Bed 3 |
|
Bed 2 |
|
Bed 4 is not actually supposed to have had a change. We were happy with the size of the duct and, for the sake of symmetry, didn't mind it being concealed in the wardrobe (which is much larger than the other wardrobes as well). We've asked Fairmont to change it back, as per our original request...yep, they must hate us. |
Skirting in the garage has been fixed:
|
What an improvement! |
|
Garage |
Glass has been installed in the bathrooms:
|
Ensuite |
|
Main Bathroom |
|
Powder Room |
Tiling has been completed:
|
Niche above bath in Main Bathroom |
|
Niche in Ensuite shower |
|
Balcony |
|
Balcony |
The window company has agreed to make custom windows for our front facade. Here's a refresher on the window issue-
The windows we signed-off on:
|
Turns out the windows aren't to code as a child could fall out of the upper level windows (fair enough) |
The windows we got (without consultation):
|
The main reason we dislike these so much, which you can't tell from this image, is that the sash's are all different thicknesses. This is because they are each comprise of two windows - one double-hung with a fixed centre pane and a fixed window with three sections. |
Windows we will now get:
|
We like that they will complement the Ensuite window and that the centre pane is uninterrupted. Because each window is comprised of three vertical windows, there should only be two different sash thicknesses. |
We ordered the carpet Thursday. We had a last-minute change on colour (not a significant difference) and are looking at a 12 week delivery date. If we're lucky and get keys before then, then we'll be living without carpet for a few weeks, but it is worth it in the end as it is the colour we originally envisaged. It's Smart Strand Silk Cosy Comfort "Pearl Glaze." It feels so soft and looks beautiful. I just hope we can keep it looking beautiful!
|
Cozy Comfort "Pearl Glaze" |
Painting has started...which brings me to The Bad News (no post is complete without it!)...
The paint listed on our tender is "Wattyl low sheen acrylic." Fairmont now use Dulux. Aside from crossing our fingers that the colour matching works, we have recently come to learn a lot about "low sheen acrylic" - there are many different types with varying levels of quality. Would you like to guess which level of quality is builders standard..? It's a product called "Hadrian Contracter," which the Dulux brochure itself says is, "recommended for affordable housing...and pastels/white colours only," and, "requires frequent re-painting." Hmmmm... For anyone who has ever lived in a "builders standard" home that is more than 18months old, you will likely know the stuff. It's chalky and comes off when you wipe the walls. The person at Dulux Mick spoke to on the phone even advised against it being used as an undercoat only (a suggested compromise by Fairmont).
Needless to say we have upgraded to Dulux Wash and Wear 101 (with Dulux One Step prep) where we can (it's too late for the trim and ceiling).
And, they painted the wrong feature wall in the Upstairs TV Room. Unbeknownst to Mick who took this photo while it was being painted (he is hopelessly colourblind and not really across the specifics of our colour choices). Doh!
|
TV Room with the colour intended for the Study |
|
Coat 1 of 5 (maybe even 6) for the Main Bedroom feature wall (this is the reason we did not want to paint this wall ourselves!)...Loving the main wall colour. |
|
Main Wall Colour - Bed 1 Wardrobe (the window is meant to be clear, it will be corrected soon) |
|
Main Wall Colour - Bed 1 Wardrobe |
|
Laundry Door |
Next issue: The Spa Bath
This is a two-for-one deal, not only was our chosen spa dis-continued, the size we thought we were getting (which quite frankly was tiny to begin with) is too big for the space we have. This one we pushed back onto Fairmont as it goes against the plan, and they came through! They'll make sure the original sized bath fits and have substituted for a similar model to replace the discontinued one, it's the Decina Carina Dolce Vita 1675:
Next on our list: Order laundry cabinetry, order lights and deliver the vanity that is currently sitting in storage...
Oh look at the gorgeous sun on your pretty house in that first pic! I was only just wondering yesterday how you guys were doing!
ReplyDeleteYour kitchen ceiling looks so amazing!
As always, the house is coming together beautifully. Bugger about the paint issues, how annoying that no matter how many things go well, there always has to be something!
Thanks Laurenb :) So true about the issues.
DeleteJust popped over from Bis building a house, you really do need to keep an eye on those builders...its going to look fantastic when its finished!!!
ReplyDeleteThanks Trish :) We try not to let the builders out of our sight. I bet they're glad we don't have keys!
DeleteIt all looks amazing. YOu must be over the moon. Loooove the kitchen!
ReplyDeleteB
Thanks B!!! Your house is really coming together too. Just the "icing on the cake" for you know and it looks amazing :)
DeletePandorash8,
ReplyDeleteIn your comment on my blog, you indicated that you are getting solid timber floors, given its a double store home, is the first step of the stairs timber or going to be carpet?
For our stairs, the first step is solid timber with carpet the rest up to the first floor (which is also carpet). We have had a couple people miss the step when coming down the stairs because our flooring is timber and they didn't relise there was a step.
Can be really dangerous. The timber floor and and the timber step colours are really close and people just don't see it.
Hopefully its not a problem you will have, but just encase thought I would mention it.
Good luck with the house.
Our first stair is solid Maple and our ground-floor is solid Sydney Blue Gum and we will be staining the Maple to look similar to the Blue Gum. I didn't think about the fact that people might misjudge the step... Will have to think about that one. I wonder if it's worth considering those metal "bumps" (I can't think of another term for them!) I see in commercial stair-cases...
DeleteWe're carpeting from the second stair all through the top-floor.