Friday, March 8, 2013

Kitchen, Paint and Other Things

After my obligatory apology for being so long between posts (sorry guys!), where do I start...

The Good News

Balcony railing has been installed:




The kitchen is (mostly) in:

I cannot wait to see the floor complete. It will make the Kitchen sing!

Photo taken through door before main painting done

Photo taken through door before main painting done

Photo taken through door before main painting done

Photos can't do the bench top and splashback justice (Caesarstone "White Shimmer"). 

Appliances are yet to be installed and the microwave cabinet is missing. The reason the cabinet is missing is because the installer decided the Aventos lift system (click here to see it) we chose intruded too much, and instead installed a door that lifts up and rolls back into the cabinet. This is exactly the cabinet we wanted to avoid. There are already scratch marks on the cabinet from the rollers (and it will only get worse with use) and the door sticks out from the cabinet about the same length as the lift system does. So, we've told them to install the Aventos system. We'll see how we go! 

The front door and stair rails are stained:






The wardrobe walls have been corrected:

Bed 3

Bed 2

Bed 4 is not actually supposed to have had a change. We were happy with the size of the duct and, for the sake of symmetry, didn't mind it being concealed in the wardrobe (which is much larger than the other wardrobes as well). We've asked Fairmont to change it back, as per our original request...yep, they must hate us.

Skirting in the garage has been fixed:

What an improvement!

Garage


Glass has been installed in the bathrooms:

Ensuite

Main Bathroom

Powder Room
Tiling has been completed:


Niche above bath in Main Bathroom

Niche in Ensuite shower

Balcony

Balcony

The window company has agreed to make custom windows for our front facade. Here's a refresher on the window issue-

The windows we signed-off on:


Turns out the windows aren't to code as a child could fall out of the upper level windows (fair enough)


The windows we got (without consultation):



The main reason we dislike these so much, which you can't tell from this image, is that the sash's are all different thicknesses. This is because they are each comprise of two windows - one double-hung with a fixed centre pane and a fixed window with three sections.


Windows we will now get:


We like that they will complement the Ensuite window and that the centre pane is uninterrupted. Because each window is comprised of three vertical windows, there should only be two different sash thicknesses.

We ordered the carpet Thursday. We had a last-minute change on colour (not a significant difference) and are looking at a 12 week delivery date. If we're lucky and get keys before then, then we'll be living without carpet for a few weeks, but it is worth it in the end as it is the colour we originally envisaged. It's Smart Strand Silk Cosy Comfort "Pearl Glaze." It feels so soft and looks beautiful. I just hope we can keep it looking beautiful!


Cozy Comfort "Pearl Glaze"

Painting has started...which brings me to The Bad News (no post is complete without it!)...

The paint listed on our tender is "Wattyl low sheen acrylic." Fairmont now use Dulux. Aside from crossing our fingers that the colour matching works, we have recently come to learn a lot about "low sheen acrylic" - there are many different types with varying levels of quality. Would you like to guess which level of quality is builders standard..? It's a product called "Hadrian Contracter," which the Dulux brochure itself says is, "recommended for affordable housing...and pastels/white colours only," and, "requires frequent re-painting." Hmmmm... For anyone who has ever lived in a "builders standard" home that is more than 18months old, you will likely know the stuff. It's chalky and comes off when you wipe the walls. The person at  Dulux Mick spoke to on the phone even advised against it being used as an undercoat only (a suggested compromise by Fairmont).

Needless to say we have upgraded to Dulux Wash and Wear 101 (with Dulux One Step prep) where we can (it's too late for the trim and ceiling).

And, they painted the wrong feature wall in the Upstairs TV Room. Unbeknownst to Mick who took this photo while it was being painted (he is hopelessly colourblind and not really across the specifics of our colour choices). Doh!



TV Room with the colour intended for the Study


Coat 1 of 5 (maybe even 6) for the Main Bedroom feature wall (this is the reason we did not want to paint this wall ourselves!)...Loving the main wall colour.


Main Wall Colour - Bed 1 Wardrobe (the window is meant to be clear, it will be corrected soon)

Main Wall Colour - Bed 1 Wardrobe


Laundry Door


Next issue: The Spa Bath

This is a two-for-one deal, not only was our chosen spa dis-continued, the size we thought we were getting (which quite frankly was tiny to begin with) is too big for the space we have. This one we pushed back onto Fairmont as it goes against the plan, and they came through! They'll make sure the original sized bath fits and have substituted for a similar model to replace the discontinued one, it's the Decina Carina Dolce Vita 1675:



Next on our list: Order laundry cabinetry, order lights and deliver the vanity that is currently sitting in storage...

Sunday, November 11, 2012

The Good, The Bad and The Ugly

Apologies for the overdue update, but as you can see even within this post, it has been an ongoing struggle for us with changes being made every five minutes! We're also planning our wedding, which has ramped up with the date being less than a year away now and our combined Engagement/Housewarming party currently planned for early March. But we'll continue to fight the good fight and keep you updated. 



The Good:

  • -       Scaffolding has come down and the exterior is (mostly) looking good:


  • -       Giprock arrived on site last week and is due to start soon


  • -       First rough-in of most trades done
  • -       Data-cabling done
  • -       Our air-con exchange unit can move next to the HWS, which frees up vital room down the side passage


  • -       Drain box was installed in the laundry


  • -       Powder room plumbing corrected


  • -   Balcony has a floor and (mostly) a roof





  • -       Waste water pipe moved from Study (Yippee!)




The Bad:

  • -       Air-conditioning: vents have not been installed as per the plans and can’t be due to direction of floor joists and raked ceiling /  ducting taking up valuable space in already tiny closets, or just badly positioned within the closets / no say was given to us before install of vents, ducts and controls (this debacle deserves its own post…stay tuned)
  • -       Positioning of some items are either incorrect or were installed without asking our input first. One such example (pictured below), is the alarm keypad (white cable) and video intercom (blue cable) which have been installed next to each other but on different walls. The video intercom location is where we specified, and allows for a consol table in the hallway. The alarm keypad was never mentioned to us, and is now inconveniently located (and must be moved):


  • -       Have I mentioned the struggle to get landscapers to quote the job? Even our landscape architect is finding it near impossible. We finally met with one on Saturday. They’ve promised to have a quote to us this week, but I’m not holding my breath. I’m also preparing for the worst, cost-wise.

The Ugly

  • -       Front windows as drawn in the plans don’t meed code (apparently double-hung windows on the second floor are a falling hazard for young children…makes sense, but would have been nice to know earlier, say, before replacements were installed). It wasn’t until the scaffolding came down that I noticed them, but now that I see them, I hate them. None of the sashes match in thickness and I hate the line that runs through the middle pane (the main reason we chose the other windows was to have one single, uninterrupted pane of glass).

It's hard to see in the pics, but none of the bars are the same thickness (because the lower part of the frame is a different window to the top section), and it doesn't look very good.


This is what we got

This is what we (now) want (originally there were only two sections either side of the centre panel)
Update: It's not looking possible to get the windows we're after (we may be playing a game of "imaginary window"). I'll keep you posted.
  • -       We can’t have our skylights *pauses to cry*. The reason, from what I can understand, is that the roofers and/or Fairmont didn’t take the skylights into account when designing the plans/roof. So, there is no flashing that exists (or can be made) that can be installed around the skylights in the position on the plans, due to the hips and valleys of the roof i.e. we could have the skylights…but they wouldn’t be water-tight. Our option is to have one smallish skylight, which I’m really unhappy with (pictured below). Plan B (which Fairmont is currently working on *fingers crossed*) is to install the largest skylight that can possibly fit. I’m trying to see the positives and be thankful that we can have a skylight at all, but this was THE favourite part of the house for me, the part I clung to when all else would go wrong. The space just suits two skylights in the size and location indicated on the plans *sigh* Let’s move on…
U Update: A skylight (not sure which one) was installed today. Stay tuned...

Fairmont's suggestion. We've asked for larger.

  • -       We’ve realised that the wall between the stairs and Bed 4 blocks light and the view. So, we’ve asked for it to be removed and balustrading installed there instead.
The wall with the red thing in front of it (currently covering the stair hole), is the one we want to remove.

  • -       Had I the time over again, I would have made the doors taller (especially downstairs).
  • -    The wardrobe in Bed 3 is very tiny, and now even tinier due to A/C ducting running through it (no choice there I'm afraid). It's 1.1m wide internally. To overcome this, we've asked for the triangular framing between the door and wardrobe to be removed so that we may install a built-in bookshelf after hand-over. This will at least add some interest and as well as storage.



  • - The views out of our fixed Media Room window and Formal Living area aren't ideal. I had thought that worst-case-scenario, they would look onto fence, and I could grow some manner of plant against them. However, because our house towers over the finished level of the soil, we will look over the fence at a rather ugly side of our neighbour's house i.e. pipes, fans and the like. In the Formal Living Room I'm content to install sheer drapes (as well as blockouts), but the fixed window in the Media Room really was a feature I was looking forward to, as you look straight at it from the Kitchen. There's not enough room or light to grow a plant to the required height as I first planned. So, my mind is currently thinking on options such as installing a very tall, thin feature of some description outside, or perhaps using a vinyl decal for the window...





I think it's too easy for tradesmen to forget that the buildings they're working on usually come with more than a financial commitment from the owner. They are people's homes, which makes the disappointment that much greater when expectations aren't met.